In this way, the entire plane of the roof slope is covered.
Posted: Thu Feb 06, 2025 3:47 am
Then the roll is rolled out along the slope to the eaves. The roofing material itself is nailed to the sheathing with roofing nails. It must be driven into the self-adhesive strip, which is australia mobile database to connect adjacent strips to each other. That is, the joining of two adjacent rolls is done with an overlap. Nails are driven in every 6 cm in a checkerboard pattern with an indentation from the edge of 2 and 4 cm.
Stage #2
An important component is to lay it correctly. The longitudinal overlap of two adjacent rolls is 10 cm. After removing the protective film, the material is laid in place and rolled on top, removing air from under the coating.
If the installation is carried out with transverse joining of two strips, the overlap should not be less than 15 cm. In this case, the edge of the lower strip is pierced with nails, bitumen mastic is applied on top, and then the edge of the upper strip is applied. Make sure that the transverse joints do not end up on the same horizontal line. The minimum distance between them in height should not be less than half a meter.
Stage #3
Covering the valley. For this, a lining carpet is required. It is attached to the sheathing with bitumen mastic, spreading it along the edges, along the entire perimeter, and with nails.
The roll tiles themselves are laid so that the valley line lies exactly in the middle of the strip. First, the part located on one slope is fastened with mastic and nails, then the other one located on the adjacent roof slope. Nails are driven in every 15–25 cm with an indentation from the edges within 2–3 cm.
Stage #4
This concerns the adjoining areas. Here the technology is standard with the use of additional additional elements made of galvanized iron sheet. That is, the roll shingles themselves must be brought to the plane adjoining the roof. This closes the joint between the two planes. An additional element is mounted on top of it, overlapping the soft roofing by at least 20-30 cm vertically.
Stage #2
An important component is to lay it correctly. The longitudinal overlap of two adjacent rolls is 10 cm. After removing the protective film, the material is laid in place and rolled on top, removing air from under the coating.
If the installation is carried out with transverse joining of two strips, the overlap should not be less than 15 cm. In this case, the edge of the lower strip is pierced with nails, bitumen mastic is applied on top, and then the edge of the upper strip is applied. Make sure that the transverse joints do not end up on the same horizontal line. The minimum distance between them in height should not be less than half a meter.
Stage #3
Covering the valley. For this, a lining carpet is required. It is attached to the sheathing with bitumen mastic, spreading it along the edges, along the entire perimeter, and with nails.
The roll tiles themselves are laid so that the valley line lies exactly in the middle of the strip. First, the part located on one slope is fastened with mastic and nails, then the other one located on the adjacent roof slope. Nails are driven in every 15–25 cm with an indentation from the edges within 2–3 cm.
Stage #4
This concerns the adjoining areas. Here the technology is standard with the use of additional additional elements made of galvanized iron sheet. That is, the roll shingles themselves must be brought to the plane adjoining the roof. This closes the joint between the two planes. An additional element is mounted on top of it, overlapping the soft roofing by at least 20-30 cm vertically.