To fix the wall plate, it is necessary to install metal studs.

A collection of data related to the UK.
Post Reply
zihadhosenjm40
Posts: 518
Joined: Sat Dec 21, 2024 3:34 am

To fix the wall plate, it is necessary to install metal studs.

Post by zihadhosenjm40 »

Before carrying out the work, the wood must be thoroughly dried. The first step is to mark and install the wall plate. It is fixed to the walls of the building. The part can be made of a bar or a strong lath. If you plan to build a roof with two slopes, the wall plate is laid on the long walls of the building. The element is necessary not only for reliable fixation of the lower part of the rafters, but also for the correct division of the load on the walls and the main part of the building.

To secure the wall plate, you should use metal studs that are attached to a beam made of monolithic concrete.

The beam should be made at the top of the wall. It is colombia mobile database possible to use steel wire embedded in the brickwork.

To secure the mauerlat to the top crown of the wooden wall, you need to use wooden dowels. The mauerlat requires high-quality waterproofing of the wooden beam. Therefore, it is necessary to use roofing felt or other material with water-repellent properties.

Before installing the wall plate, the base must be covered with roofing felt.

Installation of a Mauerlat is required if it is planned to erect a roof frame, the rafters of which rest against the upper part of the wall with beveled ends or prepared cutouts.

If you plan to make an attic, the width of which corresponds to the width of the building, the rafter legs should rest with their lower ends on the extended support parts. Powerful beams laid across the long walls can be used as supports. The number of support elements corresponds to the number of rafters. The beams must be secured to the walls in the same way as the wall plate.

Sequence of actions:

First of all, you need to prepare the part. The beam should be 10 or 15 cm. You will need to saw off the element of the required length, straighten the anchor pins if necessary and lay the beams on top of them. During installation, the part should be tapped with a hammer. If the building is made of wood, then the upper beam or log is used as a wall plate. If the building is made of stone or brick, then the beams are secured with anchors. The fasteners should be secured to the wall during installation with an indent of 2 m from each other or less.
The Mauerlat is aligned with the inner base of the wall. After the part is put on the studs, the nuts must be tightened.
The Mauerlat is mounted on metal studs
Post Reply