Only then begin to distribute it over the surface with a roller or brush.

A collection of data related to the UK.
Post Reply
zihadhosenjm40
Posts: 518
Joined: Sat Dec 21, 2024 3:34 am

Only then begin to distribute it over the surface with a roller or brush.

Post by zihadhosenjm40 »

Component “A” is thoroughly mixed in its standard container until completely homogeneous, for at least 2 minutes.
Without stopping stirring, gradually pour the required amount of component "B" into the container. Further stirring lasts at least 3 minutes, it is advisable to change the direction of rotation from the twitter data to the reverse. Particular attention should be paid to the "dead" zones in the corners between the bottom and the walls of the container.
If a primer composition is being prepared, then at this stage the required amount of clean water of the same temperature is added.
After mixing the composition, it is left for 3-5 minutes for anaeration – the release of air bubbles.
The composition is prepared with the calculation of its guaranteed production within 30 minutes. A characteristic feature is that when mixing the components, the process is accompanied by significant heating, which significantly reduces the period of "viability" of the composition. Experienced craftsmen advise to pour all the resulting epoxy paint (primer) on the floor in a snake-like manner as soon as possible, and

It is recommended that after preparing the paint, immediately pour it onto the floor surface and then begin spreading it with a brush or roller.

The primer layer is applied taking into account the average consumption of 160 – 240 ml/m². If areas of increased absorption are detected, they are primed additionally. The result should be a matte, slightly shiny surface in general.
Now is the time to move on to repair work, if it was planned on the old screed. The previously cut and cleaned areas are filled with epoxy putty for concrete, which is compacted and leveled to the general surface with a spatula. It is not necessary to apply a layer of primer over the repair patches.


Repairing surface defects with epoxy putty

The first coat of paint is applied 24 hours after the surface has been primed. This period cannot be exceeded.
When painting, the method of preparing the composition and the time of its use do not change.
It’s better to start with a brush – paint corners and other hard-to-reach places